Deel vs Remote for Commercial Solar and Energy EPC Firms
Renewable energy EPC firms should use Deel for a single project's local team and consider Remote for a multi-project regional pipeline, but first confirm whether EOR-employed staff satisfy the project's local content requirement. Many financing structures and incentive programs require a minimum share of local labor, so the staffing choice can affect financing conditions.
Deel and Remote both handle the underlying employment mechanics well. What an EPC firm needs to layer on top is a clear read on local content requirements and how project-based employment interacts with them, since getting this wrong can affect financing conditions, not just staffing convenience.
Vendors Covered in this Article
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
Do EOR-employed hires count toward local content requirements?
Many solar and wind projects, particularly ones backed by development finance institutions or government incentive programs, carry explicit local labor or local ownership content requirements as a condition of financing. An EOR-employed local hire may or may not count toward that requirement depending on the specific program's definition, which is a question for your project finance team or legal counsel, not for the EOR itself.
Get this answer in writing before you finalize staffing plans for a financed project, since discovering after financial close that your staffing structure doesn't satisfy the local content clause is a much harder problem to fix than adjusting the hiring plan up front.
Some programs also specify a minimum duration of local employment or a skills-transfer component alongside the headcount requirement, which changes how you structure the EOR contract itself. A local hire brought on for the exact length of the project and let go the day construction wraps may satisfy a headcount count but fail a program that expects ongoing local capacity building. Build any duration or training obligation into the staffing plan before the offer goes out, not as a retrofit once the financing agreement is signed.
Deel for a single project's local team
For one project, a defined EPC build with a start and a commissioning date, Deel's faster onboarding suits staffing a project manager or a handful of engineers to support the build. The relationship is naturally bounded by the project timeline, which plays to an EOR model built around speed rather than long-term entity depth.
Deel also works well when you're testing a new country's solar or wind market with a single project before deciding whether to pursue a broader regional pipeline.
Remote for a regional development pipeline
If you're building a pipeline of projects in one country or region, multiple builds over several years with a standing local team of engineers and project managers, Remote's owned-entity model gives you more consistency across contracts and a stronger foundation if you eventually want to register your own local development or construction entity.
This also matters for the local content question: a consistent, well-documented employment structure across a growing local team is easier to defend to a financing partner than a series of individually structured EOR contracts that may look different project to project.
A worked example: staffing a first overseas solar build
Say you've won your first utility-scale solar EPC contract in a new country, with financing that includes a local content requirement. Before staffing, confirm with your project finance team exactly how that requirement is measured and whether EOR-employed local staff satisfy it. If they do, Deel can get your first project manager and site engineers hired quickly against the construction schedule. If this is the first of several planned projects in the country, start the Remote conversation in parallel, since the entity groundwork takes time you'll want to have already covered by the second project.
Build in extra lead time for the confirmation step itself. Project finance teams are usually focused on the capital stack and the interconnection agreement, and the local content definition can sit unanswered longer than it should if nobody owns chasing it down. Assign one person, project controls or the EPC lead, to get a written answer before the staffing plan is finalized, and treat that answer as a gating item on the same level as permitting.
Safety and certification portability for site roles
Site safety certifications and, in some cases, professional engineering licenses for site supervision don't automatically transfer across borders any more than they do in commercial construction generally. Confirm certification requirements with the relevant host country authority for any site-based role before the project schedule assumes a specific start date, since a certification gap discovered mid-mobilization can delay a project in a way that's costly on a financed build with its own drawdown schedule.
This extends past the workforce itself to any equipment the project imports alongside the local hires, since customs and import rules for construction equipment vary by country and can affect your mobilization schedule as much as a certification gap does. Coordinate certification and import timelines together rather than treating them as separate workstreams, since a delay in either one pushes back the same construction start date.
What to document for financing partners
Keep a clear record of how your staffing structure satisfies any local content requirement, including EOR contracts, local hire counts, and any relevant certifications, in a format your financing partner or their independent engineer can review during construction monitoring. This is worth setting up as a standing template once you're doing more than one financed project, since reconstructing the documentation retroactively for a monitoring visit is far more work than maintaining it as you go.
Keep these records ready for financing partners:
- Record exactly how your staffing structure satisfies any local content requirement, including EOR contracts and local hire counts.
- Keep relevant certifications on file in a format a financing partner or independent engineer can review during construction monitoring.
- Confirm with your project finance team how local content is measured and whether EOR-employed staff count toward it.
- Turn this record into a standing template once you run more than one financed project.
What Good Looks Like
Good capability for an EPC firm means confirming how a project's local content requirement is defined and measured before finalizing a staffing structure, not assuming an EOR-employed local hire automatically satisfies it.
Building The Capability (5-Stage Skill Ladder)
How to Get Started
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
A strong fit for staffing a single, defined EPC project quickly, especially when you're testing a new country's market before a broader pipeline.
Worth the added structure once you're building a regional development pipeline with a standing local team across multiple projects.
Frequently Asked Questions
Does hiring through an EOR satisfy a project's local content requirement?
It depends entirely on how the specific financing program or incentive defines local content. Some count EOR-employed local staff, others require direct local entity employment or local ownership. Confirm this with your project finance team or legal counsel before finalizing a staffing plan.
Should a single overseas solar project use Deel or Remote?
For one project with a defined timeline, Deel's faster onboarding usually fits the construction schedule well. If this is the first of several planned projects in the same country, start evaluating Remote in parallel so the entity groundwork is ready before the pipeline grows.
Do site engineering licenses transfer to an overseas EPC project?
Not automatically. Many countries require separate licensing or a recognition process for an engineer to take professional responsibility on-site. Confirm this with the host country's licensing board well before the project's mobilization date.
About the numbers
This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.
Related Guides
Forming an Entity for a Commercial Solar EPC Contractor
The entity questions specific to a commercial solar or energy EPC contractor: licensing, interconnection agreements, tax equity, and equipment liens.
Ironclad vs LinkSquares for a Solar and Energy EPC Firm
Ironclad vs LinkSquares for commercial solar & energy EPC, covering interconnection agreements, PPAs, and subcontractor terms on project timelines.
Vouch or Embroker for a Commercial Solar and Energy EPC
A decision guide for a commercial solar and energy EPC firm weighing Vouch against Embroker on builder's risk, design liability and equipment exposure.
Banking a Commercial Solar Contractor Through a Multi-State Project
Panel and inverter procurement is paid months before a project's milestone payments clear. See how Mercury and Relay fit a solar EPC's cash needs.
Justworks vs TriNet for Commercial Solar and Energy EPC Firms
A worksheet for solar and energy EPC contractors comparing Justworks and TriNet, covering multi-state crews, prevailing wage rules, and workers' comp.
Pulley vs. Carta: Project Investors Are Not Company Shareholders
Tax equity and project ownership are a separate world from company shares. See what Pulley and Carta actually cover for a solar or energy EPC firm.