Diligent vs BoardPro for Contractors Facing Surety Reviews
A surety underwriter reviewing bonding capacity asked for current resolutions naming who could bind the company on a bond, and the contractor's minute book hadn't been updated since two officer changes ago. Contractors tend to discover governance gaps at the exact moment bonding capacity is on the line, which is a bad time to find out the paperwork doesn't match reality.
Diligent vs BoardPro for commercial general contractors bidding larger jobs should be decided on how reliably the company can hand signed, current authority documents to a surety, a bank, and an owner, often in the same week.
Vendors Covered in this Article
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
Why do sureties and banks both want the same document?
A performance bond underwriter and a construction lender ask for nearly identical proof before extending capacity: a current resolution naming exactly who can sign contracts, bonds, and draw requests on the company's behalf, along with the officers' titles and any dollar limits attached. Both parties are protecting themselves against the same risk, a signature from someone who was never actually authorized, and both will treat an outdated minute book as a reason to slow down or add conditions. Keeping one current authority document that serves both audiences avoids producing two different answers to the same question.
What changes every time an officer role changes
Every time a project executive gets promoted into a signing role, or an owner brings on a partner with authority to bind the company, the resolution needs updating the same week, not at the next annual meeting. Contractors that only revisit signing authority once a year tend to have a live gap for months at a time, and that gap becomes visible at exactly the wrong moment: mid-bond-renewal, mid-loan-closing, or mid-bid on a job requiring proof of bonding capacity. Treat every officer change as a trigger, not the calendar.
Where BoardPro handles a single-entity contractor well
A contractor operating as one entity, with a stable ownership group and infrequent officer changes, can run this discipline on BoardPro: a resolution template updated the same week authority changes, and a place the office manager or controller can pull a current copy from without waiting on legal. It is inexpensive and fast enough to satisfy most surety and bank requests, as long as somebody actually owns keeping it current rather than assuming it stays accurate on its own.
Where Diligent fits a contractor running multiple entities
Contractors that run separate entities per project, joint ventures, or a holding structure for bonding or tax reasons face a harder version of the same problem: authority has to stay current across every entity, not just one. Diligent's entity management and permissioned access keep each entity's resolution separate but centrally maintained, which matters once a surety or lender is reviewing the whole structure rather than a single company. The complexity Diligent adds tracks the complexity of the corporate structure itself, not the contractor's revenue.
A pre-bonding-season checklist
Before the next bonding renewal or major bid, pull the current resolution and check it against three things: the officers actually authorized to sign today, whether any dollar limits still match the size of work being bid, and whether the document is dated within the surety's own freshness requirement, often the last year. Catching a mismatch here, on the company's own schedule, is far better than a surety's underwriter catching it during a renewal that is already running late.
Before the next bonding renewal or major bid, verify these points:
- The officers named in the current resolution are the people actually authorized to sign today.
- Any dollar limits in the resolution still match the size of the work being bid.
- The document is dated within the surety's own freshness requirement, often the last year.
How banking controls reinforce the same discipline
A banking setup with multi-signatory approval controls, the kind Mercury offers, reinforces the same discipline the board resolution is supposed to enforce: a draw or a large disbursement requires more than one authorized signer, matching what the resolution says on paper. When the bank's own controls and the board's resolution list different people, that mismatch is worth resolving immediately rather than treating as a paperwork detail, since it means the company's actual financial controls don't match its documented governance.
A mistake that shows up at renewal, not before
The most common mistake is assuming a resolution filed once at company formation still holds years later, after multiple officer changes and possibly a new ownership structure. Sureties and lenders both ask for current documentation precisely because outdated resolutions are common, not rare, and a contractor caught with one loses standing at the exact moment it needs bonding capacity or credit the most. Review the resolution on the same cadence as insurance renewals, not as an afterthought.
What happens when the wrong person signs a contract or bond?
A contract or bond application signed by someone without actual authority does not automatically void the deal, but it does give the counterparty grounds to challenge it later, and it puts the company in the position of arguing after the fact that the signature should still count. Sureties in particular are cautious about this exposure, since a bond that turns out to be improperly authorized can complicate a claim if a project later runs into trouble. Getting the authorization right before signing costs far less than defending an authorization dispute after the fact, and it is entirely avoidable with a current resolution on file.
What Good Looks Like
A contractor can produce a current, signed resolution naming exactly who can bind the company on contracts and bonds, matched to its actual banking controls, on the same day a surety or lender asks for it.
Building The Capability (5-Stage Skill Ladder)
How to Get Started
Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.
Banking controls like Mercury's multi-signatory approval settings should name the same people the board resolution authorizes, so the bank's own controls and the company's governance record actually match.
Frequently Asked Questions
How current does a signing authority resolution need to be for a bond renewal?
Most sureties want documentation reflecting the company's current officers and structure, generally within the past year, though requirements vary by underwriter. Treat any officer change as a reason to update the resolution immediately rather than waiting for the next scheduled renewal to catch up.
Who should actually hold signing authority at a growing contractor?
Keep the list as short as reasonably possible, usually the principal owner plus one or two senior officers directly accountable for project and financial decisions. A long list of authorized signers is harder to keep current and creates more opportunities for the resolution to drift out of sync with who actually has authority in practice.
Does a joint venture need its own separate resolution?
Yes. A joint venture is typically its own entity or contractual arrangement with its own signing authority, and treating it as covered by the parent company's resolution is a common gap that sureties and lenders specifically look for during their review.
About the numbers
This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.
Related Guides
Pulley vs. Carta for Contractors Weighing an Equity Transfer
A surety underwrites the people behind a contracting business as much as its balance sheet. See what to check before transferring shares in Pulley or Carta.
Vouch or Embroker for a Commercial General Contractor
How a commercial general contractor should weigh Vouch against Embroker once builder's risk, bonding and completed-operations exposure enter the picture.
Ironclad vs LinkSquares for a Commercial General Contractor
Ironclad vs LinkSquares for commercial general contractors, covering subcontracts, change orders, lien waivers, and retainage tracking.
Deel vs Remote for Commercial General Contractors Working Abroad
How commercial general contractors should compare Deel and Remote when hiring project engineers, estimators, or site managers outside the US.
Banking a General Contracting Business Around Draw Schedules
Retainage sits back until completion, and subs want paid before the next draw clears. See how Mercury and Relay fit a commercial GC's banking picture.
Optery vs DeleteMe for the Contractor on the License Lookup
Qualifying-party licenses, mechanic's liens, and public bids all name a GC's officers. How commercial contractors should choose a removal service.