Diligent vs BoardPro for Solar EPCs Juggling Project Entities

Tax equity closing required sponsor consents for every project entity, and the list ran longer than the spreadsheet anyone was maintaining. Project finance multiplies subsidiaries faster than a corporate calendar can track them.

Diligent vs BoardPro for commercial solar & energy EPC contractors is an entity management question first and a meeting workflow question second, since most of the real governance work happens at the project-entity level, not at the parent company's board table.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Why does every energy project get its own entity?

Tax equity investors, lenders, and utility interconnection agreements typically require each solar or energy project to sit inside its own single-purpose entity, isolating that project's liabilities and cash flows from the rest of the company. This is standard structuring, not something an EPC contractor chooses to avoid, which means a contractor running a healthy pipeline of projects is also running a growing stack of entities, each one needing its own governance record kept current.

What does a tax equity closing actually require from the board?

A tax equity investor's counsel will typically request, for every entity in the transaction, a current resolution confirming who is authorized to execute the closing documents, proof the entity is in good standing, and consents for any related-party arrangements between the project entity and the parent. Assembling this for one entity is straightforward; assembling it for a dozen entities on a tight closing timeline, when several haven't had their governance touched since formation, is where deals slow down or where the paperwork gets rushed and something gets missed.

Build the entity list before the next closing, not during it

Maintain a running list of every project entity, its current officers, its formation date, and the date its resolutions were last updated, reviewed at least quarterly regardless of whether a closing is imminent. A contractor that only looks at this list when a tax equity investor's counsel starts asking questions is always working against someone else's deadline, and a closing that stalls over paperwork is a real cost, not just an inconvenience, when financing terms are locked to a rate that can move before the delay resolves.

Track these fields for every project entity:

  • The name of each project entity, so none is missing when an investor's counsel asks for the full list.
  • Its current officers and who is authorized to sign closing documents on its behalf.
  • Its formation date, kept alongside the rest of that entity's governance record.
  • The date its resolutions were last updated, reviewed at least quarterly whether or not a closing is near.

Where BoardPro fits an EPC running a handful of projects

A contractor with a small, steady pipeline, say a handful of active project entities at any given time, can keep this current on BoardPro: one resolution template reused across entities, a shared calendar for when each was last updated, and enough simplicity that the person managing project finance can maintain it without a dedicated corporate paralegal. The key requirement is discipline, not software sophistication, at this scale.

Where Diligent fits an EPC running a real pipeline

Once a contractor is running many simultaneous project entities across different stages, some closing, some operating, some being sold to a new owner, Diligent's entity management becomes the more defensible system: centralized tracking across every entity, permissioned access so a tax equity investor's counsel can review exactly what they need without exposure to unrelated projects, and an audit trail that speeds up, rather than slows down, the diligence process on the next closing.

What happens when a project entity changes ownership

Solar and energy projects frequently change hands after commercial operation begins, sold to a long-term owner once construction risk is behind the deal. That ownership change typically triggers a fresh round of governance documentation for the entity being sold, and a contractor with clean, current records from day one moves through that sale process considerably faster than one that has to reconstruct years of governance history under a buyer's timeline.

How compliance services help at this scale

A registered agent and annual filing service like Bizee, applied consistently across every project entity, keeps the baseline compliance layer from lapsing quietly on any single one, which matters because a lapsed entity discovered mid-closing can delay a transaction even when the underlying governance resolutions are otherwise in order. Pairing that baseline compliance with the board's own resolution discipline covers both halves of what a tax equity closing will actually check.

How this differs from a typical single-entity contractor

A general contractor or subcontractor operating as one entity can rely on a single, relatively static governance record that rarely needs more than an annual review. An EPC contractor structuring projects into individual entities does not get that luxury: the governance workload scales with the pipeline, not with revenue or headcount, so two contractors of similar size can face very different governance burdens depending purely on how many active project entities each one is carrying at a given time. Recognizing this early helps set realistic expectations for how much ongoing entity management the business actually needs, rather than under-resourcing it because the company's overall size seems to suggest a simpler need.

Executive Capability Standard

What Good Looks Like

An EPC contractor can produce a current, signed resolution and good-standing confirmation for any project entity in its portfolio within a day of a tax equity investor's request.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Build a list of every project entity, its officers, and when its governance record was last updated.
2. Do Manually:Set a quarterly review of that list, updating any entity whose resolution or good-standing status has gone stale.
3. Delegate:Give a project finance or legal operations lead ownership of the review and of responding to closing document requests.
4. Automate:Use BoardPro to maintain a resolution template reused consistently across every entity, tracked against the review calendar.
5. Buy:Move to Diligent once the active project pipeline makes centralized, permissioned entity management worth the added cost.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Why does every solar project need its own legal entity?

Tax equity investors and lenders typically require it to isolate a single project's liabilities, cash flows, and tax attributes from the rest of the company and from other projects. It is a standard financing structure in the sector, not an optional choice a contractor can skip to simplify governance.

How often should project entity governance be reviewed?

At least quarterly, independent of any pending closing, so a contractor isn't discovering stale resolutions for the first time when an investor's counsel starts asking questions on a tight deadline.

What happens if a resolution is missing when a tax equity deal closes?

The closing typically slows down while counsel works to get a current resolution executed, and depending on the financing terms, that delay can carry a real cost if a locked-in rate or deadline is at risk. It is far cheaper to keep resolutions current continuously than to produce them under closing pressure.

About the numbers

This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.