Executive Digital Privacy & Data Broker Removal3 min readUpdated September 2026

Optery vs DeleteMe for the Name on an Interconnection Filing

For commercial solar and energy EPC firms, Optery's broad automated coverage matches the pace of new project filings, while DeleteMe suits a contested project. Interconnection applications filed with a utility or state commission are searchable through its own docket system, and each new project can attach a fresh named contact.

Optery vs DeleteMe for commercial solar & energy epc is worth planning around at the project level, not just the company level, since each new project can create a fresh filing with a named contact attached.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Why Utility and PUC Filings Are More Exposed Than Typical Permits

Interconnection applications and state public utility commission filings for a solar or energy project often require a named project contact, and many of these filings are searchable through the utility's or PUC's own public docket system, not just a general business database.

When a Siting Dispute Gets Personal

Large commercial energy projects sometimes draw organized local opposition, and unlike a typical customer complaint, that opposition is sometimes coordinated and persistent, which changes how much it matters that a project contact's home address isn't easy to find.

It's worth having your development team flag any project where community meetings have turned tense before the interconnection filing goes public, since that's an early signal worth acting on rather than waiting until opposition has already organized around a specific name. A project team that knows in advance which projects carry elevated attention can plan accordingly instead of reacting after the fact.

Public Bids Add a Third Public Record

Responses to utility or government RFPs are frequently published once awarded, sometimes including key personnel named in the winning proposal, adding a third category of public filing alongside interconnection applications and standard business records.

Environmental impact review filings, required for larger projects in many jurisdictions, often name a project contact separately from the interconnection application itself, which means a single large project can generate two or three separate public filings each carrying the same name.

Optery for the Volume of Project-Level Filings

An EPC contractor running several projects at once accumulates a new interconnection or bid filing regularly. Broad automated coverage matches that pace, checking a wide set of sites without a manual recheck after every project.

DeleteMe for a Contested Project

If a specific project is drawing organized opposition or media attention, a human advocate who can respond to what's actively being posted or searched is worth the extra attention during that window, even if the rest of your projects use a lighter-touch approach.

A contractor working primarily with utility-scale clients rather than community-facing projects still benefits from the same review, since utility filings and public bid records are searchable by anyone, not just by the specific parties involved in a given project.

A Worked Example: A Contested Interconnection Application

A commercial solar project draws organized opposition from a neighborhood group during the interconnection review, and the project contact named on the utility's public docket becomes a target for pointed emails, and eventually a home address search, from a handful of the more determined objectors. The project ultimately gets approved, but the contact spent months as an identifiable, searchable name attached to a controversial local decision.

What made the interconnection dispute harder to manage wasn't the opposition itself, which is a predictable part of siting larger projects, but that the project contact hadn't expected to become a public figure in a local controversy when they signed up to manage permitting paperwork. That mismatch between role and exposure is worth planning for before it happens, not after.

The Mistake EPC Firms Make About Project-Level Exposure

A common mistake is treating broker exposure as a company-level concern handled once at the corporate level, when in practice each project generates its own fresh filing with its own named contact. A check done for the company's officers two years ago says nothing about the project manager named on this quarter's interconnection application.

The same dynamic plays out with community benefit agreements, increasingly common on larger commercial solar and storage projects, which are sometimes filed publicly and can name a company representative as the point of contact for community concerns over the life of the project, not just during construction.

A Rule for High-Visibility Projects Specifically

For any project likely to draw public attention, a siting fight, a large utility-scale interconnection, treat the broker-exposure check as part of project kickoff, not an afterthought. Doing it early gives you a cleaner baseline before public comment periods start, rather than trying to catch up once opposition is already organized.

A reasonable safeguard is designating a project-facing spokesperson distinct from whoever's named on the technical interconnection filing, so public-facing community engagement and the underlying regulatory paperwork don't automatically funnel every kind of contact toward the same individual.

Project-level checks worth building into your process:

  • Treat the broker-exposure check as part of project kickoff for any high-visibility project, before public comment periods begin.
  • Check the named project contact on each new interconnection application, not just the company's officers.
  • Ask whether a project manager or another authorized project contact can be listed instead of the company's principal.
  • Recheck when a utility or government bid is awarded and published, since key personnel are sometimes named in the winning proposal.
  • Bring in a human advocate for a contested project drawing organized opposition or media attention.
Executive Capability Standard

What Good Looks Like

Project contacts named on interconnection and bid filings are checked for broker exposure at the start of each project, not after a dispute arises.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Review your current interconnection and PUC filings to see whose contact information is listed and whether it's public.
2. Do Manually:Pull up each project contact's name on a broker site or two and submit the opt-out forms yourself.
3. Delegate:Have your project management team default to listing a project manager, not the owner, as the contact on new filings.
4. Automate:Rerun the broker check at the start of every new project's interconnection or bid process.
5. Buy:Use Optery or DeleteMe for the ongoing removal work, and route entity filings through Bizee's registered agent service.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Can we list a project manager instead of an owner on interconnection filings?

Often yes. Many utility and PUC filings accept any authorized project contact, not specifically the company's principal. Check with whoever manages your interconnection applications about using a project manager's information instead.

Does broker removal help with organized opposition to a project?

Broker removal makes a home address or personal phone number harder to find, which matters if opposition turns personal. It doesn't address the underlying siting dispute, which typically needs your normal community relations or legal process. Treat it as one layer of protection for the project contact, not a fix for the dispute.

How often should filings be rechecked given how many projects we run?

It's worth tying the recheck to each new project's interconnection or bid filing, since each one is a fresh opportunity for a broker to pick up a name and address that wasn't previously exposed.

About the numbers

This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.

Related Guides